12V Reset
Power cycles all of the eFuses on the Vehicle Front Controller (VCFRONT) and shuts off Sleep Bypass.
PROC_VCFRONT_X_12V-RESET
Model3/tasks/PROC_VCFRONT_X_THERMAL-FIVE-WAY-VALVE-FLOW-TEST
Starts the Thermal Five Way Valve Flow Test. The routine will run for up to 5 minutes.
Select your vehicle’s hardware to see task details, requirements, and inputs. Availability is confirmed after connection.
The vehicle must be in park and disconnected from a charger before starting this test. The battery coolant temperature must be below 45C.
This task has no listed user inputs.
Power cycles all of the eFuses on the Vehicle Front Controller (VCFRONT) and shuts off Sleep Bypass.
PROC_VCFRONT_X_12V-RESET
Performs louver connection check. Will only move the louver through partial range of motion.
TEST-SELF_VCFRONT_X_ACTIVE-LOUVER
Tests for power, connection, and communication of the ambient sensor controlled by the Front Vehicle Controller (VCFRONT).
TEST-SELF_VCFRONT_X_AMBIENT-TEMP
Tests for power, connection, and communication of the battery coolant pump controlled by the Front Vehicle Controller (VCFRONT).
TEST-SELF_VCFRONT_X_COOLANT-PUMP-BATTERY